CTG Latam currently has a diversified and competitive portfolio of greenfield and operational projects, in Colombia and Mexico.
CTG Latam currently has a diversified and competitive portfolio of greenfield and operational projects, in Colombia and Mexico.
Solar Projects located in different States of the Republic with an operational installed capacity of 534.9 MWp
Proyectos Solares ubicados en diferentes Estados de la República con una capacidad operativa instalada de 534.9 MWp
Projects:
Perote II is a PV plant of 118.9 MWp. The Project consists of 44 JEMA Energy central inverters of 2,605 kW and 312,939 Jinko Solar PV modules. The power generated is fed into the 115kV transmission lines of the Comisión Federal de Electricidad (CFE) through an 34.5/230 kV elevator substation.
Perote II es una planta fotovoltaica de 118.9 MWp limitada a una capacidad de exportación de 100 MWac. El proyecto consta de 44 inversores centrales JEMA Energy de 2.605 kW y 312.939 módulos fotovoltaicos Jinko Solar. La energía generada se alimenta a las líneas de transmisión de 115 kV de la Comisión Federal de Electricidad (CFE) a través de una subestación elevadora de 34.5/230 kV.
Solar projects located in different departments of the Country with a potential installed capacity of 510,4 MWp of which the first 300MW will start construction during the year of 2023.
Proyectos solares ubicados en diferentes departamentos del País con una capacidad instalada potencial de 510,4 MWp de los cuales los primeros 300MW iniciarán construcción durante el año 2023.
+57 (601) 756 0364
Cra 11 # 77A-49 Of. 601 Bogotá - COL
For more information about China Three Gorges Corporation, please access: